The Lomas del Sol barrio, located along the road to the Cabo San Lucas airport, will be receiving an additional 10.5 gallons of water per second. This, thanks to the finding of water well # 5. The water will be flowing in 45 days maximum, when the installation of the pumping and piping system is done.